STRUV forms commercial structures across Melbourne and Victoria — suspended slabs, walls, columns, lift and stair cores — on a repeating deck-to-deck cycle with propping and back-propping designed in-house.

Multi-level commercial building under construction with formwork decks and propping to the levels below

Scope of works

Conventional Shoring Systems
Columns, walls and lift or stair cores
Back-propping through completed levels
Post-tensioned deck coordination and stressing access
Edge protection, access and fall control
Deck-to-deck cycle management with reo and concrete

Engineering input

Deck loads and back-propping are checked through the levels below before the first pour, table and prop layouts are drawn rather than set out on site, strip times are nominated by the engineer against measured strength gain, and the cycle is written into a methodology the head contractor can programme against.

Service FAQs

Five to seven days per level is typical on a repetitive floor plate using table or drophead systems. Cycle speed is usually governed by concrete strength gain for stripping, crane time, and steel delivery schedules — not formwork labour capacity.